Engineering case

Engineering case

Shounong Group-Sanyuan Stock Warehouse Shuttle Shelf Project Successfully Completed


Beijing Jiuweistorage shelfThis time with Shounong Group, Sanyuan Stock WarehouseShuttle RackWith the cooperation of several employees of Jiuwei Engineering Department, the shuttle truck shelf project has been successfully completed on schedule. At present, it has been put into use and has been well received by customers.

 

In this warehouse shuttle car shelf project, the project engineering department considered customer needs from many aspects when designing the warehouse plan,ShuttleBoth sides of the track head are equipped with guide plates, which are mainly used for restriction and guidance.

 

Jiuwei's new generation of intelligent remote control shuttle is equipped with a high-intelligence sensor system, which accurately senses the objects in front and locates them accurately.ShuttleLocation.

 

In addition, in order to ensure that forklift drivers collideShuttle Rack, There is a forklift block in front of the shuttle truck rack track to prevent the forklift from colliding with the shuttle truck rack.

 

The whole project of shuttle truck shelf has a short construction period, and Jiuwei Company has a heavy task. The project engineering team reasonably arranges the production, manufacturing, installation, debugging and other work contents according to the customer's needs. Deliver on time within the time limit specified by the customer. At present, the whole project has been put into use, the customer in the use process is relatively smooth, did not encounter difficult problems, for our wholeShuttle RackThe project was well received.



Copyright©beijing jiuwei technology co ltd

Powered by 300.cn SEO  Privacy_statement

Business License